Donate using PayPal

Cycling in Clevedon

The local group for this area has not added any information yet - come back soon!

Other areas …

Latest photos of the area

See also a full list of photos in this area.

Cycle shelter near Churchill Building

Cycle hoops outside Harptree Building

Toucan crossing carrying the NCN26 / Strawberry Line over the A370 / Weston Road in Congresbury. The photo shows the crossing and the ramps up to the path as it continues along the embankment beside the Congresbury Yeo River. Note that th ... [more]

Access onto NCN33 / Brean Down Way from Wayacre Drove. The path is accessed through the space on the right of the gate, which is usually locked. The space is a reasonable width at over 1.5m, although the surface is loose and it is right b ... [more]

One of two kissing gates on the Brean Down Way / NCN33 between Uphill and Brean. Like the other gate the space on this one is restricted and overgrown. There is just sufficient space for a standard cycle - a tandem, bike and trailer, or a ... [more]

A swing gate on the NCN33 / Brean Down Way. Return spring is very strong, and the latch is stiff to operate. This is one of three similar gates on this section of pathway.

Barrier chicane at the point where the Strawberry Line / NCN26 merges with the pavement on Station Road in Sandford. The barrier spacing is not as bad as some at just over 1m, but the barriers are placed partway up a fairly steep slope, ... [more]

Junction of Wrington Road with the A370 / Bristol Road in Congresbury. There is a pass through opposite into a contraflow cycle lane on Wood Hill - unfortunately most map systems show this as one way, not taking into account the contraflow ... [more]

Bollard chicane at the junction of the Festival Way / NCN33 path with Backwell Bow. There are two smaller bollards behind the larger one (one is obscured in the photo), producing quite a tight space for access of approximately 90cm.

The Festival Way / NCN33 crossing of Station Road in Flax Bourton. The single bollard has a reasonable space of over 1m each side and does not present a problem in terms of accessibility. Care should be exercised when crossing here howeve ... [more]

A pair of A frames at the point where the Strawberry Line / NCN26 crosses the entrance to Winscombe Sports Ground. The width of the A frames is 76cm. There are a number of similar A frames along this section of NCN26. The presence of the ... [more]

An pair of A frames on the NCN26 / Strawberry Line between Shute Shelve Tunnel and Winscombe. The gap through the frames is 76cm. The second (northernmost) frame in the photo is especially difficult to navigate due to a tree being very ... [more]

One of the A frames on the Strawberry Line NCN26. This one is on the section that runs north from the A361 in Sandford to Nye Road. The gap in this A frame is 76cm; for comparison the handlebars on the bike in the photo are 42cm wide.

An A frame on the NCN26 / Strawberry Line, obstructing the path south from Sandford towards Winscombe. The gap through the A frame is 76 cm. There are several other similar frames on the same stretch of path.

Barriers, bollard, and a salt bin obstructing the northern end of the bridge carrying NCN334 over the M5 and the Portbury Hundred. There are no obstructions on the southern side of the bridge in Portbury and the gradient is easier.

A Frame on NCN33 / Brean Down Way, on Brean Sluice. Space through the frames is 72cm. There is a lock on the gate alongside, but it is not a RADAR lock. This is one of six obstacles on the BDW between WsM and Brean - one A frame, two kis ... [more]

Swing gate on NCN33 Brean Down Way. No alternative to this gate, latch and return spring are quite stiff.

Kissing gate on the Brean Down cycle path at Uphill. Just large enough to get a single bike through. The route is further obstructed by another similar kissing gate, three swing gates, and an A frame.

Barrier to traffic free path. Post lying on the floor and narrow entrance around the side.

Poorly maintained and narrow cycle path.

Narrow entrance to traffic free route

06_2016_017 Fuel price sign on the M5 near Weston-super-Mare, June 2016 [Highways England bending over backwards to provide every possible piece of information for the motorist]

Shared use path on Rownham Hill in North Somerset

Toll Bridge Filter 01 Location: Clifton, Bristol (England, United Kingdom)

Rough cycle tracks, suitable for road bikes Lots of farm gates, not suitable for tandem bikes

National cycle route sign showing direction to Uphill and the junction of NCN 336. This is the only sign for NCN 336 and it is confusing as to where this cycle route actually is.

Track in this section of the NCN 33 is poor and not suitable for road bikes

Local cycle route direction sign

Cycle route sign at the NCN 26 and NCN 410 junction

First sign of the Nailsea to Bristol section of the NCN 33 (festival way)

Myrtle Hill PILL

Pedestrian and cycle way over M5 and Portbury Hundreds

St Georges church taken from junction of the Breaches and Church Road.

High Street & Mill Lane Junction

St George's Hill Flower Bank

Church lane

Most inadequate new cycle path of 2014? At Jct. 21 M5. 102 centimetres wide. Seriously.

Cut-through in Worle, Weston-super-Mare

Cut-through (much narrower behind the camera)

Paths to bus stop, road crossing and through housing development - shame so much water gathers in the dip.

Paths to bus stop (left), road crossing and through housing development - shame so much water gathers in the dip.

Cut-through from car parking area to Courtenay Walk

Dropped kerb needed here.

Dropped kerbs but no other provision where Courtenay Walk crosses a road.

Barriers on otherwise permeable housing development, Worle, Weston-super-Mare

Barriers on otherwise permeable housing development, Worle, Weston-super-Mare

Permeable housing development, Worle, Weston-super-Mare

Permeable development, Worle

Dropped kerb needed (Courtenay Walk, Worle, Weston-super-Mare - not on any online maps)

Road closure and modal filter at Weston super Mare station

Route sign and covered cycle parking at Weston super Mare station.

Weston super Mare's promenade - a totally un-cyclefriendly road layout.

Cyclist going the wrong way on Weston super Mare's promenade - a totally un-cyclefriendly road layout.

Chicane of bollards

Cycle and footway alongside M5 motorway at Avonmouth Bridge

Cycle path towards Portishead under M5 motorway bridge, with disused railway track alongside

Signs galore at start of ramp up to Avonmouth Bridge! Junction of NCN 41 and 26.

Cycle track with separate footway heading west from Pill towards Avonmouth Bridge

Start of another section of path on River Avon Trail

Short length of wide tarmac path on River Avon Trail between Ham Green and Pill

Start of path at Ham Green. Would be nice if dropped kerb was in alignment with the path.

Locked gate and bypass with opening hinged bar at entrance to River Avon Trail path at Chapel Pill

Just passing through Location: , Portishead (England, United Kingdom)

Path next to disused railway under the M5

Speed limit on cycle path on the M5 Avonmouth Bridge

Strawberry Line path Location: Yatton, Hewish Archway marking the start of the Strawberry Line path. Slightly spooky. All it seemed to need was the legend "Arbeit macht frei" attached.

Nice to have a path mostly to yourself if you are a cyclist! I cannot remember exactly where it was but near enough I think.

Single Track woods

My trusty steed.

Cyclists on the Clifton Suspension Bridge - a useful and well-used route.

Cycle route along the Avon below the Clifton Suspension Bridge

Video cycling along NCN Route 41 under the Clifton Suspension Bridge toward Avonmouth.

View of Avonmouth Bridge from NCN Route 41.

Well-decorated commemorative milestone near Hart Close.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://clevedon.cyclestreets.net/area/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.